Elevated Water Storage Tank

Location of Work:

Dugway Proving Ground, Utah

Completion Date:

December 2003

Description:

Build 250,000 gallon elevated steel water tank, concrete-filled steel pipe pile foundations, 300 GPM water well, pump house with water treatment and process controls, overhead power distribution. Changes initiated by owner included relocation of project site due to groundwater contamination. Additional work included re-surveying the project site, providing an additional 1000 LF of overhead power line and costs associated with accelerating geotechnical investigation and water quality analysis activities.